News APP

NewsApp (Free)

Read news as it happens
Download NewsApp

Available on  gplay

This article was first published 13 years ago
Rediff.com  » News » ISRO to meet on Saturday, will analyse GSLV-D3 failure

ISRO to meet on Saturday, will analyse GSLV-D3 failure

Source: PTI
April 16, 2010 13:47 IST
Get Rediff News in your Inbox:

India's top space scientists will be meeting in Thiruvananthapuram on Saturday to analyse the data and find the cause for failure of GSLV-D3 rocket, which was launched for the first time on Thursday using an indigenously made cryogenic engine.

As per the initial indications, the problem could have been related to the ignition of the cryogenic engine leading to the rocket tumbling, losing altitude and finally plunging into sea little over eight minutes after the lift-off from Sriharikota spaceport.

"Senior Indian Space Research Organisation scientists, mainly working in propulsion area, are meeting in Thiruvananthapuram tomorrow afternoon to make a detailed analysis of the flight data," an official of the Bangalore-headquartered space agency said on Friday.

The meeting will be chaired by S Ramakrishnan, director (projects) of the Vikram Sarabhai Space Centre.

The flight-testing of the indigenous cryogenic engine and the stage as part of the Geosynchronous Satellite Launch Vehicle (GSLV-D3) mission was not successful, dashing India's hopes of joining the elite club of space-faring nations possessing the complex technology required for launching heavier satellites.

The Thiruvananthapuram-based VSSC is the major centre of the ISRO, where the design and development activities of satellite launch vehicles and sounding rockets are carried out and made ready for launch operations.

"The problem may be related to the ignition of the main engine. But it (the analysis) is going to be a tricky affair as the data we got is limited," the official said.

ISRO officials would analyse the flight data in terms of parameters such as pressure and temperature and hold discussions on corrective measures to be taken for the next flight test of the indigenous cryogenic engine and stage within the next one year.

GSLV-D3 vehicle lifted off as planned at 4.27 pm from the spaceport of Sriharikota after a countdown procedure lasting 29 hours. The countdown went off as planned. GSLV-D3 vehicle performance was normal up to the end of the second stage lasting 293 seconds.

Afterwards, the cryogenic stage was to ignite and burn for about 720 seconds to provide the necessary velocity to inject the GSAT-4 satellite, carried by the rocket, into the intended geosynchronous transfer orbit, but things did not go as planned in that phase.
Get Rediff News in your Inbox:
Source: PTI© Copyright 2024 PTI. All rights reserved. Republication or redistribution of PTI content, including by framing or similar means, is expressly prohibited without the prior written consent.
 
CHINESE CHALLENGE - 2022

CHINESE CHALLENGE