NewsApp (Free)

Read news as it happens
Download NewsApp

Available on  

Rediff News  All News  » Business » 508 km in 3 hours... All you need to know about India's first bullet train

508 km in 3 hours... All you need to know about India's first bullet train

September 14, 2017 13:51 IST

Prime Minister Narendra Modi and his Japanese counterpart Shinzo Abe on Thursday launched India’s first bullet train project in Ahmedabad.

Here’s all you need to know about the project. 

IMAGE: Prime Minister Narendra Modi and the Prime Minister of Japan, Shinzo Abe at the ground breaking ceremony of Mumbai-Ahmedabad High Speed Rail Project in Ahmedabad. Photograph: PTI Photo
India’s first bullet train between Ahmedabad and Mumbai will run at a maximum speed of 350 km per hour, covering a 508-km stretch in under three hours
The ambitious project would cost around Rs 1.10 lakh crore. Japan is giving a loan of Rs 88,000 crore for the project at a minimal interest of 0.1 per cent
The government wants to start the services of the proposed Ahmedabad-Mumbai High Speed Rail Network, commonly known as the bullet train on August 15, 2022 to mark India’s 75th year of Independence
The bullet train would run at an average speed of 320 km per hour and at a maximum speed of 350 km per hour
It will stop at 12 railway stations on the route but only for 165 seconds each. A 21-km-long tunnel will be dug between Boisar and Bandra-Kurla Complex in Mumbai, of which seven km will be under water
The railways will only require around 825 hectares of land for the project as 92 per cent of the route will be elevated, six per cent would go through tunnels and only the remaining two per cent would be on the ground
The railways would run about around 35 bullet trains when it starts operation with about 70 trips per day. The number of trains would be increased to 105 trains in 2050
Initially, the train would have 10 coaches with a total seating capacity of 750 passengers. Later, it is proposed to have 16 coaches with a seating capacity of 1,250 passengers
The train would have two categories of seats -- executive and economy -- with the prices comparable with the base AC 2-tier fare of the Rajdhani Express
In the initial days, around 1.6 crore people are expected to travel by the train annually, adding that by 2050, around 1.6 lakh commuters would be travelling by the high-speed train on a daily basis
The train would require a cleaning time of four hours, after running for 20 hours
© Copyright 2018 PTI. All rights reserved. Republication or redistribution of PTI content, including by framing or similar means, is expressly prohibited without the prior written consent.